High-quality energy-efficient Modular Octagon Lighting for Offices and Conference Rooms

  • by Helian LED lighting
  • Model: HL-PB5075A-E81
  • Ships in: 1-2 weeks
  • Built to order

Our modular octagon linear lighting is designed to provide high-quality illumination while being energy-efficient. With a beam angle of 135°, this lighting solution is perfect for offices, conference rooms, and other commercial spaces. The unit has a nominal power of 1200 Lm and an input voltage of 1108, ensuring reliable performance. It also features a CRI of 90+, providing excellent color rendering. Installation must be done by a qualified electrician, and the unit must be earthed if an earth connecting point exists.

Note: The weight is for reference only, please refer to the actual.

More info

Installation:

Step 1:Assembly product

Please assemble the modules corresponding to the correct angles.

Assembly product

Step 2:Install

Please make sure that the place of installation could stand 10 times the weight of itself before installing in a place where is no vibration,
no swing, and no fire risk.

Install step2 1
1. Use an electric drill to make holes
in the appropriate locations on the
wooden board or cement wall.
Install step2 2
2.Secure the rubber plug in the
hole;Use screws to secure
the bracket to the rubber plugs.
Install step2 3
3.After connecting the wires, put
the power directly into the ceiling
plate.Install the ceiling plate lock
on the bracket
Install step2 4
4.Thread the hanging rope through
the locking device on the ceiling
plate.
Install step2 5
5.Attach the light fixture to the
hanging rope, adjust to the desired
height and position, and the installation
is complete.
Install step2 6
6.After installation, correctly connect
the AC power line of the light fixture
to the mains power supply.

Packing

packing
ModelHL-PB5075A-E81Carton box860mm*480mm*440mm
Inner box840mm*460mm*100mmQTY/Carton4 PCS
NW7.3kg/PCSGW8.2kg/PCS
Packing Parameters

USER INSTRUCTIONS

  1. The installation of the unit must be done by a qualified electrician.
  2. The unit must be earthed in case an earth connecting point exists.
  3. Ensure that the mains is switched off during servicing.
  4. Do not use bulb(s) bigger than the indicated on units name-plate or packaging.
  5. Ensure that after the installation,the unit is properiy fixed and the cable clamps (if exist)are well tighened.
  6. Manufacturer will not accept liability for injury or damage resulting from incorrect use or installation.