Welcome to Helian Electronics, a Complete LED Lighting Solution Provider.
1. The installation of the unif must be done by a qualified electrician.
2. The unit must be earthed in case an earth connecting point exists.
3. Ensure that the mains is switched off during servicing.
4. Do not use buib(s) bigger than the indicated on units name-plate or packaging.
5. Ensure that after the installation,the unit is properiy fixed and the cable clamps (if exist)are well tighened.
6. Manufacturer will not accept liability for injury or damage resulting from incorrect use or installation.
Don’t like it? Change batch
Phone:(+86) – 0755 – 27606785
E-mail: info@hlled.com
tracy@hlled.com
Copyright © 2023 Shenzhen Helian Electronics Co., Ltd(HLLED)